Tampere is halfway through building its Pirkkala–Linnainmaa tram line, is planning a housing district on the former Hiedanranta industrial site and reports falling emissions.

Updated · Checked against official sources

  • Population

    263,337 (2025); third largest city in Finland

    2025

  • Mayor

    Ilmari Nurminen

  • EU programmes

    6

Latest

  1. AI and technology ·

    Tampere co-hosts UN forum on AI and the citiverse with ITU and UN-Habitat

    Tampere, ITU and UN-Habitat organised a Forum on AI and Citiverse at Tampere Hall on 9–10 September 2026, followed by the first meeting of a new ITU-T focus group on AI for cities.

    Facts and source
    • ITU and UN-Habitat, together with the City of Tampere, organised the Forum on AI and Citiverse at Tampere Hall on 9–10 September 2026.
    • Deputy Mayor Jaakko Mustakallio is a Vice-Chair of the Executive Committee of the Discovering the Citiverse global initiative.
    • The forum was followed by the first meeting of the new ITU-T Focus Group on AI for Smart Sustainable Cities and Communities (FG-AI4SSC).

    Source: City of Tampere, “UN International AI and Citiverse Forum brings urban development leaders from around the world to Tampere”

  2. Culture ·

    Tampere completes renovation of the Tullikamari Cultural Centre

    The renovated Tullikamari Cultural Centre was handed over to its users on 1 September 2026, with Tampere Jazz Happening as its first event.

    Facts and source
    • The extensive renovation of the Tullikamari Cultural Centre has been completed.
    • More than 500 professionals worked on the renovation.
    • The first event in the renewed venue is the 45th Tampere Jazz Happening, from 29 October to 1 November 2026.

    Source: City of Tampere, “Tullikamari reopens for culture and events”

  3. Mobility ·

    Tampere's Pirkkala–Linnainmaa tram extension passes the halfway mark

    Design and construction of phase 1 of Tampere's Pirkkala–Linnainmaa tram line passed 50% at the end of June 2026, slightly ahead of schedule.

    Facts and source
    • At the end of June 2026, design and construction of phase 1 of the Pirkkala–Linnainmaa line was more than 50% complete.
    • More than 2.7 of the 7.1 track-kilometres planned for phase 1 had been installed.
    • Passenger service on the new sections is due to start in August 2028.

    Source: City of Tampere, “Half of the Pirkkala–Linnainmaa Tramway alliance’s work completed”

  4. Climate and energy ·

    Tampere's regional emissions fell 9% in 2024, with transport now the largest source

    Tampere's 2024 emissions calculation shows a 9% fall excluding industry, driven by electrified district heating, while road transport remains the largest source.

    Facts and source
    • Excluding industrial emissions, Tampere's regional emissions in 2024 were 9% lower than in 2023.
    • The fall came mainly from the electrification of district heating production.
    • Transport caused 213 kilotons of CO2e, or 36% of emissions.

    Source: City of Tampere, “Regional climate emissions in Tampere fell by 9 percent – transport is the largest source of emissions”

  5. Regeneration and housing ·

    Tampere publishes draft plan for the centre of the new Hiedanranta district

    Tampere has put on view a draft local detailed plan for 14.6 hectares of the former Hiedanranta–Lielahti industrial area, with housing for more than 3,000 residents.

    Facts and source
    • The draft plan for Hiedanranta centre I covers about 14.6 hectares of the former Hiedanranta–Lielahti industrial area.
    • Housing will account for about 155,000 m² of floor area, enough in theory for more than 3,000 residents.
    • Parking will be concentrated in two parking facilities with around 600 spaces.

    Source: City of Tampere, “The centre of new Hiedanranta district is taking shape – local detailed plan preparation documents are available for viewing”

City briefs are drafted with AI from official sources; every fact is checked against the source text before an editor approves it.

Projects we track

4 projects · 1 completed · 1 under way

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    Pirkkala–Linnainmaa tram line, phase 1

    Design and construction of the first phase passed 50% at the end of June 2026, with 2.7 of 7.1 track-kilometres laid; passenger service on the new sections is due to begin in August 2028.

    Mobility

    Status checked 20 October 2026 · Source

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    Hiedanranta centre I local detailed plan

    A draft plan for 14.6 hectares of the former Hiedanranta–Lielahti industrial area sets out seven large blocks with about 155,000 m² of housing, enough for more than 3,000 residents.

    Regeneration and housing

    Status checked 20 October 2026 · Source

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    Tullikamari Cultural Centre renovation

    The renovation of one of Tampere's main event venues was completed in August 2026 and the building was handed to its users on 1 September; the first event is Tampere Jazz Happening at the end of October.

    Culture

    Status checked 20 October 2026 · Source

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    Tampere Market Hall refurbishment

    The city is updating the feasibility study for a major refurbishment of the protected 1901 market hall, covering technical solutions, costs and temporary arrangements; the assessment is due in late 2026.

    Regeneration and housing

    Status checked 20 October 2026 · Source